A PRACTICAL NOTE · Troubleshooting

How to apply this guide

Compare the recording and written reference for 2014 for the replica and 1890 for the original, then document the correction or keep the conflict open.

Start with

Use the museum’s cleared narration and its exhibit labels. Record the time of “The replica was added in 2014, while the catalogue dates the original to 1890.” and the version date of the written reference. Highlight the exact mismatch without editing either asset first.

Check before you finish

In the accessible exhibit transcript, cite the source that supports your chosen wording. When a change was confirmed later, mark it as a correction and give its date. Follow up to verify both dates against the exhibit labels once the decision is explicit.

Evidence to keep: Record the expected sentence, actual result, microphone, language, model and app build before changing settings. This page’s key limit is: Compare the recording and written reference for 2014 for the replica and 1890 for the original, then document the correction or keep the conflict open.

Start here

If the transcript of a museum audio guide draft disagrees with a written record, preserve both long enough to check why. A mistaken transcript, a later correction, and a genuine disagreement need different updates.

Put both versions side by side

Use the museum’s cleared narration and its exhibit labels. Record the time of “The replica was added in 2014, while the catalogue dates the original to 1890.” and the version date of the written reference. Highlight the exact mismatch without editing either asset first.

Decide which claim has evidence

Check 2014 for the replica and 1890 for the original and ask the exhibit editor to confirm whether the written record is a later correction. Keep whether the replica’s maker is credited open while sources disagree. Check qualifiers such as “tentative” or “scheduled” alongside literal values.

Write a traceable update

In the accessible exhibit transcript, cite the source that supports your chosen wording. When a change was confirmed later, mark it as a correction and give its date. Follow up to verify both dates against the exhibit labels once the decision is explicit.

Keep exploring